The turbines are installed in the year 2011 - 6nos & remaining 19nos. are installed in in the year 2012 .
The turbines are assembled in India with sourcing of the parts from reputed suppliers from India and overseas as per German technology /design .
The Turbines are second hand and in good working condition .
The turbines has generated 91259246 kWhr till September 2014 .
available: from immediately